Everyone remember where we parked.
* Course rebuilding meeting
* Purchased Mouseposé
* Purchased the Solspace Tagging Module for ExpressionEngine
* Check-in
* Respondus documentation
* ECHO Calendar documentation
* DMDL/DLN migration documentation
* Course rebuilding
(Level 2, Row C… I think)
Month: February 2008
Frosty Friday
* Calendar Development
* Noncredit discussion
* Found a grade calculation explanation for a client
Snowing on this side of the hump…
* EcoEcon – set up “modules” and install tagging tool
* Document Bb quiz issue
* Calendar Development
* Outline EcoEcon docs
* Check-in
* Upgrade ExpressionEngine to 1.6.2
* Planning for On-Site visit
* Book hotel
* Process ICCIE
Camel the Hump Day
* Made a lot of progress on ecoecon – expression engine is holding up pretty impressively as a flexible, powerful CMS. Still need to tighten a few things up and add the module/object component.
* Processed ICCIE
* Processed IBM
* Responded to OASys user problem
Looks like I’m running out of catchy status report titles, doesn’t it?
weekday++;
* Found link creation bug issue (feature?) in Bb Test Canvas (i.e. adding a link in a quiz question). Can it be done in respondus?
* Bb account creation
* Processed IBM
* Finished first PD draft
* Addressed OASys issues
* Course structure modification
* Tried to download Mouseposé, but the site is down?
* Discovered funky bug with Safari 3 in Bb 7.x
* EcoEcon planning
week(start);
First Friday
* Faculty meeting and course planning
* PD meeting
* EcoEcon planning/research/documentation
* Calendar development
* Software installs
* “Weekly” review (remember those?) and project list cleanup/management
* Tested out MFIC image slideshow on various platforms – need PowerPoint Viewer (at the minimum) to view .pps files
* The book I ordered is in at the bookstore.