9 June 2014: Monday

LDAP:

  • One student employee – found the match, did the merge.

BACKUPS:

  • Tape movement day: 136 sent to Vault, 384 (128*3) returned¬†from Vault
  • Weekend full saves all completed!

Footprints:

  • Downloaded and installed the 9.5.4 upgrade on ankle. ¬†Still unable to get the 11.6.02 code and no response from BMC today on ISSUE=316851 PROJ=4 — which is quite frustrating.

 

Tags:

Leave a Reply

You must be logged in to post a comment.