4 September 2013: Wednesday

Backup:

  • Several backup failures reported to system administrators for examination.
  • Labeling of tapes retrieved from vault, continues.

LDAP:

  • Six update failures, manually dealt with:
    • One sent to OSP for clarification. ┬áThe clarification came and so inquiry made to Registrar about possibility of a misspelled last name on a former student entry.
    • One Former Student entry created manually.
    • Two graduate student employees matched with their Banner roles.
    • Two graduate student employees sent to HR for clarification and subsequently merged with their student based entries.

Hardware:

  • Mann Data Center organized prior to tour.

Meetings:

  • SAA Team meeting.
  • IdM EAS meeting.

 

Tags:

Comments are closed.